Your browser does not support script
Alberta Sun Uranium Project
Torlon Hill Zinc Project
Sonora Project (gold),Yukon
Photo Galleries
Photo Gallery
Consulting Geologist J. Cleary in Cinco Hermanos workings
57
KB, approx. 12 seconds at 56.6Kbps
Massive galena and bright red zinc zap reaction in Cinco Hermanos workings
82
KB, approx. 16 seconds at 56.6Kbps
Massive galena in Cinco Hermanos workings
93
KB, approx. 18 seconds at 56.6Kbps
Mineralized breccia and zinc zap reaction (before and after)
277
KB, approx. 53 seconds at 56.6Kbps
Al Workman of WGM, Lori Walton and Ken Shortt examine drill core
66
KB, approx. 13 seconds at 56.6Kbps
Firestone QP John Cleary examining drill core on the TH-06-3 drill site
53
KB, approx. 11 seconds at 56.6Kbps
Drill Pad Construction
338
KB, approx. 1 minute, 4 seconds at 56.6Kbps
Drill Pad Preparation
340
KB, approx. 1 minute, 4 seconds at 56.6Kbps
Rock Sampling
177
KB, approx. 34 seconds at 56.6Kbps
More Sampling
155
KB, approx. 30 seconds at 56.6Kbps
Smithsonite (zinc carbonate)
61
KB, approx. 12 seconds at 56.6Kbps
Tunnels
187
KB, approx. 36 seconds at 56.6Kbps
Torlon Hill
78
KB, approx. 15 seconds at 56.6Kbps
View of Torlon Hill valley
71
KB, approx. 14 seconds at 56.6Kbps
L. Walton, President for Firestone (on right) with Property Owner representative (on left)
76
KB, approx. 15 seconds at 56.6Kbps
© 2007 Firestone Ventures Inc. All Rights Reserved. |
Disclaimer